Sign In | Join Free | My spintoband.com
China Foshan ABD Equipment Co., Ltd. logo
Foshan ABD Equipment Co., Ltd.
ABD Machine, a Brilliant Design for YOU!
Verified Supplier

4 Years

Home > Powder Coating Production Line >

High Quality Powder Coat Curing Tunnel Oven

Foshan ABD Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Quality Powder Coat Curing Tunnel Oven

  • 1
  • 2

Place of Origin : Guangdong

Brand Name : ABD

Packaging Details : Packed in parts and loaded into the container

Supply Ability : 30 Set/Sets per Month

Price : Negotiate

Type : Coating Production Line

Substrate : Steel

Condition : New

Machine Type : curing oven, Spray Booths, Plc Controller Programmable Logic Controller, Conveying Equipment, Drying Oven, Curing oven, Coating Equipment

Video outgoing-inspection : Provided

Machinery Test Report : Provided

Marketing Type : New Product 2021

Warranty of core components : 1 Year

Core Components : PLC, Motor

Power : multi power

Dimension(L*W*H) : according to your needs

Warranty : 1 Year

Applicable Industries : Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Farms, Home Use, Retail, Construction works

Showroom Location : Egypt, Canada, Turkey, United Kingdom, United States, Italy, France, Germany, Viet Nam, Philippines, Brazil, Peru, Saudi Arabia, Indonesia, Pakistan, Mexico, Russia, Spain, Thailand, Kenya, Argentina, South Korea, Chile, UAE, Colombia, Algeria, Sri Lanka,

After-sales Service Provided : Engineers available to service machinery overseas

Wall panel : Rock wool steel board,150 mm thick,anti-flame and heat-insulation

Control system : process setting system:could set baking temperature etc

Car powder curing furnace : metal doors powder heating machine

Contact Now

High Quality Powder Coat Curing Tunnel Oven

Product Description

Powder coating oven
Outside Size 3500 x 2700 x 3000mm(LXWXH)
Inside Size 3200x 2400 x 2700mm(LXWXH);
Wall panel Rock wool steel board,150 mm thick,anti-flame and heat-insulation
Heating system OPTION 1 1set of Riello FS20 natural gas burner,200000Kcal/h
stainless steel heat exchanger,max temp:220 ℃, heating time: 20-25 min (180-220℃).
Circulation fans:1 set 3.0kw high-temperatute resisting fan,air flow capacity:3000m3/h.Fan and burner box inner is 2 mm thick galvanized steel,interlayer 150mm thick rock wool,out is 1.2mm thick galvanized steel to keep heat
Control system Temperature alarm(With inductor in the oven) ,stop button,process setting system:could set baking time and temperature,when baking time arrive,stop automaticly
Total power 3kw


Powder coating oven with track rail:

High Quality Powder Coat Curing Tunnel Oven

Powder coating oven components:

High Quality Powder Coat Curing Tunnel Oven

Our Services

Customization of powder coating line

Before customized design for your painting line, there are some points needing your confirmation:
1). What's the size (L*W*H) of your workshop for this painting line?
2). What's the shape, size(L*W*H), weight of parts to be painted? Could you please send

me some pictures of the parts?
3). How many parts to be painted in a working day (8hours)?
4). Is there any oil or rust on the surface of the parts? If yes, how about the amount?
5). How many times do you want to paint such parts?
6). What's your desired heating source for baking the paint, diesel, natural gas or electric?
7). How about the electric voltage and frequency in your palce?

Why Choose Colin

1. Provide professional person to communicate with you before the order.
2. Provide powder coating line with advanced technology, exquisite workmanship,

top design.

3. Provide strict quality check for each part, each process before export.
4. Provide optimum system solution based on each client’s specific requirement and

local location’s weather condition.
5. Provide complete post-sale service, including installation, technical guide and training.

Packaging & Shipping

FAQ

1.What payment do you accept?

Irrevocable L/C at sight and T/T.

2.What is your payment terms?

30% T/T deposit, 70% T/T or irrevocable L/C at sight before shipping.

3.How long will you need for producing the products?

Usually we will start purchase raw materials after receiving the deposit and start producing, normally will need 30-35 working days.

4.What is your main products?

Our main products are powder coating line, powder coating booth(manual type and automatic type), powder coating oven, pretreatment system, water curtain booth etc.

5.Can you install for us?

Sure, we have a experienced and professional overseas installation engineer team at your service.

Related Products

High Quality Powder Coat Curing Tunnel Oven

Powder Coating Line Manual Powder Coating Booth Automatic Powder Coating Booth

High Quality Powder Coat Curing Tunnel Oven


Product Tags:

Curing Tunnel Oven

      

Powder Coat Curing Tunnel Oven

      

High Quality Curing Tunnel Oven

      
Wholesale High Quality Powder Coat Curing Tunnel Oven from china suppliers

High Quality Powder Coat Curing Tunnel Oven Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Foshan ABD Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0